Address Total SF/​Office SF Rate/Cost Description
MedicaLogic
20540 NW Evergreen Parkway
Hillsboro, Oregon 97124

This brick and glass exterior project was completed in 2000. Specht Development was hired as the project manager to oversee construction of the Class A office building. The project includes generous parking and is located in the desirable Sunset Corridor off of Highway 26.

Lovejoy Block Two
1333 NW Lovejoy Street
Portland, Oregon 97209

Block 2 consists of a 329,000 square foot, 16-story residential building with ground-floor retail. The building offers a unique, multi-level structure, with a variety of for-rent residential product types and an integrated parking structure for residents. The building’s exterior features glass and brick with metal panel accents. A green roof garden is available for tenant use.

The entire project achieved LEED® Gold Certification and includes the following sustainable building features:

  •  An ecoroof on the top of the tower, reducing storm water runoff and reducing the heat island effect.
  • Recycling of construction materials from demolished structures (including creating benches for pedestrians from the wooden beams removed from the prior structure).
  • Recycling of construction waste materials.
  • Remediation and redevelopment of a brownfield site.
  • An ecoroof on the top of the tower, reducing storm water runoff and reducing the heat island effect.
  • Recycling of construction materials from demolished structures (including creating benches for pedestrians from the wooden beams removed from the prior structure).
  • Recycling of construction waste materials.
  • Remediation and redevelopment of a brownfield site.

 

 

 

Lovejoy Block One
1303 NW Lovejoy Street
Portland, Oregon 97209

Block 1 contains a nine-story, 290,000 square foot mixed-use building with ground floor retail, four levels of parking, and 3 levels of office. The ground floor retail will be mostly occupied by a full-service Safeway grocery store. As one of the first Safeway stores to be located in a dense urban area, the project team had to overcome many unique challenges with such a facility. The building was constructed using an innovative pre-cast system, being built out of over 2,400 pieces of pre-cast concrete. This method was new to this type of building and required a well-coordinated effort between all project team members to successfully implement.

The entire project achieved LEED® Gold Certification and includes the following sustainable building features: 

  • An ecoroof on the top of the tower, reducing storm water runoff and reducing the heat island effect.
  • Recycling of construction materials from demolished structures (including creating benches for pedestrians from the wooden beams removed from the prior structure).
  • Recycling of construction waste materials.
  • Remediation and redevelopment of a brownfield site. 
 
 

Local 290 – Springfield
2861 Pierce Parkway
Springfield, Oregon 97477

Specht Development was selected as the Project Manager for the new Plumbers & Steamfitters Local 290 Training Center located in Springfield, Oregon. The Training Center is a two-story concrete tilt-up building with approximately 35,000 square feet of total area. The Training Center consists of classrooms, an auditorium, office and shop space.

Lloyd Place Apartments
1500 NE 15th Avenue
Portland, Oregon 97232

Lloyd Place is a 202 unit mixed-use project located adjacent to the Lloyd Center shopping mall. The 5-story U-shaped buildings wrap around courtyards and include 12,000 square feet of ground-floor retail and office space with surface and underground parking.

Kelley Point Distribution Center
15805-15925 NW Lombard
Portland, Oregon 97203

Calwest Industrial Holdings, LLC (an affiliate of RREEF) hired Specht Development, Inc. as the Project Manager for the development of Buildings 4 & 5 at the Kelley Point Distribution Center in the Rivergate Industrial District in Portland, Oregon.

Buildings 4 & 5 total 409,500 square feet of 30’ high clear distribution space. At a total project cost in excess of $22,000,000, this phase of the project was completed in October 2007. The distribution center is close to I-5.
 

Huntair, Inc.
11555 SW Myslony Street
Tualatin, Oregon 97062

Huntair, Inc., a global manufacturer of air management equipment, chose Specht Development, Inc. to oversee the project management of their facility relocation. Huntair provides air-handling solutions for building interiors and manufacturing processes including cleanroom ceiling systems. The company's industrial HVAC applications are used in biotechnology and pharmaceutical manufacturing, aerospace and hospitals.

Bob Burns, Vice President of Construction at Specht Development, Inc. coordinated and facilitated the planning, design, permitting and fit-up of the 315,000 square-foot facility in Tualatin, OR. The Huntair relocation is expected to be completed in the later part of 2012.

Hollywood Video
813 State Route 9 NE
Lake Stevens, Oregon 98258
Hollywood Video
4825 Evergreen Way
Everett, Oregon 98203
Hardwood Industries
20548 SW Wildrose Place
Sherwood, Oregon 97140

Specht Development, Inc. was hired by Hardwood Industries as the Project Manager for a 123,285 sf manufacturing and headquarters building located in Sherwood, Oregon. Specht oversaw all aspects of the $6,845,585 project including: coordination of land use applications (partition & site plan review), building design, contractor bidding process and construction management. The project was completed in 2004.