Address Total SF/​Office SF Rate/Cost Description
Trailblazer Foods
17900 NE San Rafael Street
Gresham, Oregon 97230

Specht Development was hired to oversee the tenant improvement construction of 40,000 square feet of this food processing and packing facility. The project was completed in 2010.

Specht Industrial Building IV
13320 NE Jarrett Street
Portland, Oregon 97230

Completed in December 1999, the Specht Industrial Building IV totals 23,106 sf, of which 3,466 sf is office space. The building has a 24-foot clear height, four dock doors and two grade level doors. The building is located in Portland and has excellent access to I-205, I-84, Airport Way, Marine Drive, and the Portland International Airport.
 

Riverside Industrial Park
13422-13625 NE Jarrett Street
Portland, Oregon 97230

The project units include industrial showrooms and distribution space. The building is located off Airport Way and offers immediate access to I-84 and I-205.

Sunnybrook Office Building
10025 SE Sunnybrook
Clackamas, Oregon 97015

 

Completed in July 2000, the Class A Sunnybrook Office Building is a four story steel frame, concrete deck, brick clad structure, with below-grade parking. A full building lobby extends from the main eastern entrance, allowing natural light and access through the lobby core area as well as access to a secondary pedestrian entrance located on the west side of the building.
 
The building has three five-story elevators, one of which is used for both freight purposes and passenger movement. Upon completion of construction, the project was sold to Quest Group Trust VII for $15,746,000.
 
Tigard Corporate Center
12123 SW 69th Avenue
Tigard, Oregon 97223

Completed in December 2000, the Tigard Corporate Center consists of three two-story architecturally designed concrete tilt buildings, each with a steel structural system and Class A core and office interiors.  In addition, a 362-stall, 5-story parking garage was built for Household International, who leased the entire complex during the construction phase of the project.

The project was built with 100% union labor and is conveniently located between I-5, Highway 99 and Highway 217 in Tigard, Oregon. The infrastructure for the project was completed in partnership with the City of Tigard and financed through a local improvement district that Specht worked with the City to form.
 

Protocol Systems, Inc.
8500 SW Creekside Place
Beaverton, Oregon 97008

This project involved an office expansion in which Specht Development was hired to oversee construction of the office addition.
 

Stoner Electric
1904 SE Ochoco Street
Milwaukie, Oregon 97222
Stoel Rives
SW PARK AVE & 9TH
Portland, Oregon 97205

Specht Development, Inc. was hired to serve as the owner’s representative for the interior tenant improvements in the Park Avenue West Tower building.

Stafford Distribution Center
9325-9685 SW Ridder Road
Wilsonville, Oregon 97070

Stafford Limited Partnership developed the 249,746-square foot, four building Stafford Distribution Center in Wilsonville, Oregon, just 15 miles south of Portland. The $6,910,000, all-union project broke ground on September 23, 1988, and was completed on March 23, 1989. The site contains four high-cube industrial warehouse buildings. The Specht Company is the managing General Partner and this project is managed by Specht Properties.

This project was developed while Gregory Specht was employed by Scherzer Partners, Inc. Specht resigned as President of Scherzer Partners, Inc. in November 1990.
 

T.Y. Lin International
285 Liberty Street NE
Salem, Oregon 97301

Specht Development provided construction management services for the tenant improvement project in T.Y. Lin’s Salem, OR location. The office is approximately 6,500 square feet of open work spaces and private offices.

T.Y. Lin International is an engineering and architectural firm specializing in transportation infrastructure.